Advanta Services, electrical and climate
Hager consumer unit second fix

Electrical

Fuseboard upgrades

Replacing tired consumer units with modern RCBO boards, labelled circuits and a clean second fix.

What we cover

Boards we fit

Replacement of a tired consumer unit with a modern board, sized to the circuits already in the property. Domestic and light commercial, including Hager.

BG consumer unit second fix

01

The upgrade

Each circuit is identified before the old board comes off, so the new one is the right size and readable.

  • RCBO consumer units
  • Metal boards and dual-RCD replacements where they suit the install
  • Every way labelled

02

What is included

Testing and the certificate are part of the job, not an extra once the cover is on.

  • Tested and certified
  • A record of the finished board
  • A straight answer if the rest of the wiring needs work

How it works

From the old board to a labelled upgrade

A fuseboard upgrade replaces a tired consumer unit with a modern RCBO board. We look at the existing circuits first, so the new board is the right size and every way is labelled. Testing and certification are part of the job.

Hager consumer unit second fix
BG consumer unit second fix
  1. Step 1

    Send the existing board

    Send a clear photo of your consumer unit and circuit labels. Please leave all covers in place. Include the postcode. We will say if other wiring needs attention before a straight swap is the right job.

  2. Step 2

    A fixed price before we book

    The quote covers the new board, the changeover and the certificate. If a circuit is unlikely to test cleanly, we tell you before the day starts rather than halfway through it.

  3. Step 3

    Changeover, test and label

    The new board goes on, every circuit is labelled, and the installation is tested before we leave. You get the certificate and a record of the finished board.

Next step

An upgrade priced from the board you have

Send a clear photo of your consumer unit and circuit labels. Please leave all covers in place. We will say if a straight swap is the right job, and what the new board will cost.

Monday to Friday, 08:00 to 17:00. Emergency call-outs out of hours · chris@advantaservices.co.uk

Advanta Services Ford Transit Custom

Local

Where we work

Based around Spalding and Peterborough. We cover Lincolnshire, Cambridgeshire, Norfolk, Suffolk, Essex, Hertfordshire, Northamptonshire and Rutland. Call us with the town and the job.

Spalding & Pinchbeck

Spalding, Pinchbeck, Bourne, Crowland, Holbeach, Long Sutton, Market Deeping, Gosberton, Sutton Bridge

Peterborough

Peterborough, Hampton, Werrington, Orton, Eye, Whittlesey, Market Deeping

Wisbech

Wisbech, March, Long Sutton, Sutton Bridge, Whittlesey

Boston

Boston, Kirton, Sutterton, Heckington, Sleaford

Stamford

Stamford, Bourne, The Deepings, Market Deeping, Ketton, Ryhall

Lincolnshire

Spalding, Pinchbeck, Boston, Bourne, Stamford, Holbeach, Sleaford, Long Sutton, Crowland, Kirton, Gosberton, Market Deeping, Sutterton, Heckington, Sutton Bridge

Cambridgeshire

Peterborough, Wisbech, March, Whittlesey, Ely, Huntingdon, St Neots, St Ives, Hampton, Werrington, Orton, Eye, Market Deeping

Norfolk

King's Lynn, Downham Market, Hunstanton, Swaffham, Fakenham, Dersingham, Heacham, Terrington

Suffolk

Bury St Edmunds, Newmarket, Mildenhall, Haverhill, Sudbury, Stowmarket, Brandon, Lakenheath

Essex

Saffron Walden, Braintree, Chelmsford, Colchester, Halstead, Great Dunmow, Stansted, Witham

Hertfordshire

Bishop's Stortford, Royston, Hitchin, Stevenage, Ware, Baldock, Buntingford, Letchworth

Northamptonshire

Northampton, Kettering, Corby, Wellingborough, Oundle, Thrapston, Rushden, Raunds

Rutland

Oakham, Uppingham, Cottesmore, Empingham, Ketton, Langham, Whissendine, Ryhall

FAQ

Frequently asked questions

Often after an EICR, if there are no spare ways, or the board still has rewireable fuses. If an upgrade is not needed yet, we will say so.

We fit modern RCBO consumer units, including Hager. Every circuit is labelled, the board is tested, and the certificate is ready before we leave.

Yes, for the changeover. A straightforward domestic board is often done in a day. We agree the timing so you know when the power is off.

Yes. The new board is tested and certified. If the rest of the wiring needs work, we tell you rather than hiding it behind a new cover.

Sometimes, if the board is modern and has room. If it is full, or it is an old fuse board, a replacement is usually the better job.